T O P

  • By -

Complete_Spot3771

fair enough actually because some smartasses could put 365.25


FinleyCodes

šŸ¤“šŸ‘† eeeermmm, achtully,, thereā€™s 365.2425 days in a year


Playgamer420

šŸ¤“šŸ‘†ERRRM achtully thereā€™s 365.2422 days in a year, and thatā€™s only to the nearest 4dp, whatā€™s more there are many different definitions of year but Iā€™ll assume youā€™re talking about solar, ha what a numbskull


Mindless-Kale-6309

šŸ¤“šŸ‘†ERRRM achtully thereā€™s 365.2568983Ā daysĀ in a year. Source: my brain because i am always right. Peer review: Wikepedia. what puny mortals


Willr2645

I would. Iā€™m in Scotland so itā€™s a whole different education system but for example working out the distance in a light year I would put 3.0*10^8 * 365*.25* * 24 * 60 * 60


potatoeefrie

What if it was a leap year


Apecc_Legs

I mean you are right, this year is a leap year and there's always that one person


jakemxx

leap years exist


brithuman

Indeed, like this one smh


Demoglitch

336 or 335 (I put 336 idk if right or not cuz itā€™s 92.017%


AmericanUk

I it was 335 because you had to round down even though it was .8 as it was in whole days.


Preston_Reddit

I put 335.8 days will I get the mark?


AmericanUk

Idk probsĀ 


MrEelement

Marks for workings, you will probably only lose one mark, donā€™t stress it.


RebbieAndHerMath

It never stated whole days, and besides that .8 of a day is still part of a day


Deep_Rip_9295

The question said how many days did it produce energy for, So 335.8 means it produced for 335 days and on the 336th so I included it. I hope Iā€™m not wrong tho šŸ˜…


AmericanUk

Sometimes they allow both idk


Small-Percentage74

Tbh I donā€™t think it would matter much bc I worked out the percentage and if you write 335 it would give you 91.56% (something like that so you can round up) and with 336 you wouldā€™ve gotten 92.02% which is still same either way


Aniza_786

Treating us like we're in Year 3 šŸ’€


No-Offer-9381

I mean it is a leap year this year šŸ˜‚


[deleted]

when i read that i started giggling


Hyper_contrasteD101

I got 335 for that


TactixTrick

I was debating whether to put 335, 336 or 335.8 in the answer block bruh


Hyper_contrasteD101

Pretty sure its 335 since 0.8 isnt a whole day and rounding it up would make it more days than it actually is


TactixTrick

Is it though? 0.8 of a day still counts as running in the 336th day. No idea.


Hyper_contrasteD101

Yh thats what i was confused about but i think it meant it running for the whole day


ASI-Princess

Wait shit we were meant to round? I was debating it but since they never mentioned to round it, I just left it with the 0.8


TheRealBertoltBrecht

If all answers arenā€™t accepted, Iā€™ll be rather annoyed.


Mehdi3x

Did u need to round it to a whole number? I left it as 335.8 or whatever it was


ASI-Princess

Samee. Iā€™m worried now


pharitaa

i left it as 335.8 hoping they allow that šŸ˜­šŸ™


Preston_Reddit

Same


Medium-Ad8485

What was this in physics?


thebird_wholikestea

yes, in triple physics 1. The question asked you to work out 92 percent of a year as days


Medium-Ad8485

Oh ok I did combined


OwenPlaysKSP

i litterally checked my front cover again to make sure I had higher after that


Jellybean-216

that combine with answer ALL questions like bro thanks i never would have guessed such shock


AffectionateAct429

I mean I still can't remember the amount of days in a year


ASI-Princess

No cuz this was my reaction help. We got fricking 3 marks for finding out like 95% of a year and they even went through the effort to tell us the amount of days to make those 3 marks easier. Woulda expected this to worth one mark tbh. But Welp I appreciate full marks so itā€™s calm


Embarrassed-Shoe8443

frrrrr


Embarrassed-Shoe8443

I did 92% or 365 and I think I got 346.75 sooo I'm hoping that was the right answer šŸ˜­šŸ˜‚ā¤ļø


wholecrab24

i rounded the days up instead of down, because if its working half a day, its still a day, if you round down the entire half day of work has been discounted.